British Columbia Ministry of Energy, Mines and Natural Gas and Responsible for Housing
News | The Premier Online | Ministries & Organizations | Job Opportunities | Main Index

MINFILE Home page  ARIS Home page  MINFILE Search page  Property File Search
Help Help
File Created: 08-May-2014 by Karl A. Flower (KAF)
Last Edit:  08-May-2014 by Karl A. Flower (KAF)

Summary Help Help

NMI
Name MS 4-5, MS-4, MS-5, MAD Mining Division Clinton
BCGS Map 092O010
Status Showing NTS Map 092O01E
Latitude 051º 04' 32'' UTM 10 (NAD 83)
Longitude 122º 08' 22'' Northing 5658579
Easting 560286
Commodities Gold, Silver, Copper Deposit Types
Tectonic Belt Intermontane Terrane Stikine
Capsule Geology

The MS 4-5 occurrence is located on the south side of Watson Bar Creek at an elevation of approximately 1050 metres.

The region is underlain by mainly sedimentary rocks of the Lower Cretaceous Jackass Mountain Group, cut by several cross faults and splays of the Fraser fault. Intruding the Jackass Mountain Group are numerous dikes and small stocks of quartz feldspar porphyry.

Locally, a major fault, striking 110 degrees, is marked by siliceous breccias and quartz-calcite stock works. Quartz veins and siliceous replacements host disseminated to massive pyrite, arsenopyrite, sphalerite, galena and chalcopyrite. The massive sulphide veins range up to 0.5 metre wide.

In 1987, sampling of the MS 4 vein yielded:

--------------------------------------------------

Sample Length Silver Gold

(No.) (metres) (grams per tonne)(grams per tonne)

1363 0.15 34.3 26.4

1364 1.22 5.8 2.5

1365 0.20 6.5 25.4

1366 0.23 11.3 11.9

1367 0.61 3.1 7.8

1368 0.15 21.3 15.4

----------------------------------------------------

(Assessment Report 16713)

In 2006, a chip sample (UR4) from a massive sulphide vein assayed 24.7 grams per tonne gold, 0.829 per cent copper and greater than 1 per cent arsenic over 0.4 metre. Another chip sample (UR2) from an oxidized vein assayed 19.5 grams per tonne gold over 0.15 metre (Assessment Report 28628).

During 1983 through 1985, Utah Mines completed programs of geological mapping, geochemical sampling and an induced polarization survey on the area as the Mad claims. In 1987 and 1988, Southern Gold Resources completed programs of geological mapping and rock and soil sampling. In 1997 and 1998, First Point Capital, on the behalf of BHP Minerals, completed programs of rock, silt and soil sampling. In 2006 and 2007, Durfield Geological completed programs of geological mapping, geochemical sampling and an induced polarization survey.

Bibliography
EMPR BULL 44, p. 109
EMPR EXPL 1988-C130-131; 1997-39
EMPR INF CIRC 1998-1, p. 27
EMPR OF 1988-29
GSC OF 534; 2207
GSC P 1967-54

COPYRIGHT | DISCLAIMER | PRIVACY | ACCESSIBILITY