British Columbia Ministry of Energy, Mines and Natural Gas and Responsible for Housing
News | The Premier Online | Ministries & Organizations | Job Opportunities | Main Index

MINFILE Home page  ARIS Home page  MINFILE Search page  Property File Search
Help Help
File Created: 24-Jul-1985 by BC Geological Survey (BCGS)
Last Edit:  19-Oct-2021 by George Owsiacki (GO)

Summary Help Help

NMI 104N11 Au1
Name BOULDER CREEK Mining Division Atlin
BCGS Map 104N063
Status Past Producer NTS Map 104N11W
Latitude 059º 39' 38'' UTM 08 (NAD 83)
Longitude 133º 25' 20'' Northing 6614666
Easting 588899
Commodities Gold, Tungsten Deposit Types C01 : Surficial placers
Tectonic Belt Intermontane Terrane Cache Creek, Plutonic Rocks
Capsule Geology

Boulder Creek flows south into the west end of Surprise Lake about 17 kilometres northeast of the community of Atlin. The stream is about 6 kilometres long and braids into three separate streams near its mouth where most of the placer work has been done. From the years 1898 to 1945, 1920 kilograms of gold were taken from the creek (Bulletin 28). The creek was extensively hydraulic mined at the lower end and has received a resurgence of work in the 1980s. It is the third largest producer in Atlin.

The headwaters of the creek are located within a fine grained alaskite body of the Late Cretaceous Surprise Lake batholith (Surprise Lake Plutonic Suite). The creek then flows out of the pluton and over Upper Paleozoic ultramafic and volcanic rocks of the Cache Creek Complex. The volcanic rocks belong to the upper Mississippian to Permian Nakina Formation and comprise mafic greenstone flows and minor volcanic greywacke. The upper Mississippian to Permian ultramafic rocks are often altered to serpentinite.

Most of the gold was taken from the lower end of the creek and very little at the upper end where it flows over the batholith. There is significant placer wolframite in Boulder Creek and several wolframite showings in areas surrounding the headwaters of the creek.

Hydraulic mining was done on Boulder Creek from 1927 to 1941 and produced most of the gold recovered from the creek. A dam was built on the upper reaches of the creek to supply water for operations lower down.

Bibliography
EMPR AR 1899-611,646,649,653; 1900-757,774,779; 1901-983; 1903-41,44; 1904-69,70,88,94; 1905-72,75; 1906-52,57; 1907-50,53; 1908-48,52; 1909-51; 1910-53; 1911-57; 1912-58; 1913-69; 1914-77,86, 1915-61; 1916-44,45; 1917-75,78; 1918-96,98; 1919-87,89; 1920-72; 1921-75,81,83; 1922-89; 1924-81; 1926-109; 1927-115; 1928-122; 1929-121,427; 1930-124; 1932-70; 1933-89; 1935-B28,G47; 1936-B59; 1937-B44; 1938-B29; 1939-104; 1940-88; 1941-83; 1942-83; 1945-124; 1946-195; 1947-188; 1948-172; 1949-238; 1950-196; 1951-202; 1953-174; 1955-82; 1957-73;1958-78
EMPR ASS RPT 7209
EMPR BULL 1 (1931), p. 35; 2 (1930), p. 19; *28, pp. 17, 18; 94
EMPR GEM 1969-375
EMPR MISC PUB (Stratigraphy of the Placers in Atlin, Placer Mining Camp, P.J. & W.M. Proudlock, 1976)
EMPR OF 1989-15; 1989-24; 1991-17; 1996-11; 1999-3
EMPR P 1984-2
EMPR PF (Black, J.M. (1953): Atlin Placer Camp, Unpublished Report, 116 pages)
GSC EC GEOL Vol.17
GSC MEM 307
GSC OF 864
GSC P 74-47
GSC SUM RPT XII, 1899; XIII, 1900

COPYRIGHT | DISCLAIMER | PRIVACY | ACCESSIBILITY