British Columbia Ministry of Energy, Mines and Natural Gas and Responsible for Housing
News | The Premier Online | Ministries & Organizations | Job Opportunities | Main Index

MINFILE Home page  ARIS Home page  MINFILE Search page  Property File Search
Help Help
File Created: 12-Jan-1989 by Dani J. Alldrick (DJA)
Last Edit:  09-Jul-2020 by Karl A. Flower (KAF)

Summary Help Help

NMI 104B8 Cu2
Name KERR P, PYRAMID Mining Division Skeena
BCGS Map 104B049
Status Prospect NTS Map 104B08W
Latitude 056º 28' 19'' UTM 09 (NAD 83)
Longitude 130º 16' 18'' Northing 6259333
Easting 421661
Commodities Copper, Gold Deposit Types L04 : Porphyry Cu +/- Mo +/- Au
Tectonic Belt Intermontane Terrane Stikine
Capsule Geology

The Sulphurets-Mitchell Creek area is underlain by rock of the Lower Jurassic Unuk River Formation, Hazelton Group. These rocks in- clude green to grey volcanic epiclastics and a sequence of dominantly fine-grained marine sediments. A third sequence of massive red and green volcanic sandstones and conglomerates form the highest peaks capping the stratigraphic sections.

The mineral occurrence is reported to lie entirely within a "tectonic shear zone". This zone contains all of the significant gold anomalies. The zone covers an elongated northern trending area, 800 to 900 metres wide and 2 kilometres long. The zone is flanked by comparitively unaltered or weakly altered, fine-grained, brownish green clastic sediments and submarine volcanic rocks on the east, and by a thick unit of basaltic andesite on the west. This tectonic zone is typically composed of moderately to strongly altered and sheared rocks, interpreted to be of volcanic, subvolcanic or plutonic origin. Most of the altered zone can be described as a sericite schist. How- ever andesitic tuffs and flows, and feldspar porphyry dykes and possible flows, can be recognized in the less altered zone. A later formed "swarm" of fine-grained, weakly altered andesite dykes cuts across the schistosity. Both the altered zone and dykes have been cut by faults. Minor sections of silty shale and siltstone occur on the western and eastern margin of the altered zone.

The Pyramid zone outcrops as a prominent, gossanous knoll in the large cirque basin on the north side of the Kerr Ridge. It lies within the same fault-bounded block of ground as the B zone and is probably the northern continuation of the B zone. The western bounding fault is the Number 3 Fault, the eastern bounding fault is the B zone Fault.

Like the B zone, the Pyramid zone consists of massive, wholly silicified country rock that has been subsequently crushed to a crackle breccia texture. The hairline fractures of the crackle breccia are lined with fine black sooty chalcocite, with lesser chalcopyrite and pyrite. The alteration assemblage also includes chlorite, sericite and pyrite. The P zone was tested by trenching and a single diamond-drill hole in 1988. No assay results are available.

Bibliography
EMPR ASS RPT 12471, 13369, 14614, 15493, *16616
EMPR BULL 63
EMPR EXPL 1983-522; 1984-386; 1985-A24,A52; 1986-C440; 1987-A15,C376
EMPR FIELDWORK 1987, pp. 199-209
EMPR INF CIRC 1986-1, pp. 14,18; 1988-1, p. 12 (BC Mineral Exploration
Review 1985, 1987)
EMPR OF 1988-4
EMPR PF (Newmont Exploration of Canada Ltd.: Geology Map, 1:31,250
Scale; Sulphurets Gold Corporation: Prospectus, Jul.22, 1987,
Statement of Material Facts (#61/88), Jun.30, 1988; Western
Canadian Mining Corporation: Annual Report 1987, Press Release,
Sept.28, 1988)
EMR MP CORPFILE (Western Canadian Mining Corporation)
GSC MAP 9-1957; 1418A
GSC P 89-1E, pp. 145-154
GCNL #70,#194, 1985; #232, 1986; #142,#144,#165,#173,#177,#182,#202,
#204, 1987; #75,#155,#156,#163,#167,#191, 1988
N MINER Nov.9,Dec.14, 1987; Sept.19,Oct.3,10,Nov.28, 1988
V STOCKWATCH Aug.27,Sept.8,11,23,27,Oct.21,23,26,Nov.16, 1987
Kirkham, R.V., (1963): The Geology and Mineral Deposits in the
Vicinity of the Mitchell and Sulphurets Glaciers, M.Sc. Thesis,
University of British Columbia
Simpson, T.M., (1983): The Geology and Hydrothermal Alteration of the
Sulphurets Deposits, Northwest British Columbia, M.Sc. Thesis,
University of Idaho
Lechner, M.J. (2007-04-06): Mitchell Creek Technical Report
Lechner, M.J. (2008-02-29): Kerr-Sulphurets Technical Report
Lechner, M.J. (2008-03-27): Updated Mitchell Creek Technical Report
Grills, F. (2008-12-19): Kerr-Sulphurets-Mitchell Preliminary Economic Assessment 2008
Lechner, M.J. (2009-03-30): Updated KSM Mineral Resources
Grills, F. (2009-09-08): Kerr-Sulphurets-Mitchell (KSM) Preliminary Economic Assessment Addendum 2009
Lechner, M.J. (2010-01-25): January 2010 Updated KSM Mineral Resources
Grills, F. (2010-03-31): Kerr-Sulphurets-Mitchell (KSM) Prefeasibility Study
Lechner, M.J. (2011-03-29): March 2011 Updated KSM Mineral Resources
Ghaffari, H. (2011-06-15): Kerr-Sulphurets-Mitchell (KSM) Prefeasibility Study Update 2011
Huang, J. (2012-06-22): 2012 KSM (Kerr-Sulphurets-Mitchell) Prefeasibility Study
Lechner, M.J. (2014-03-31): NI 43-101 Technical Report on Initial Deep Kerr Resource
Huang, J. (2014-11-11): 2012 KSM (Kerr-Sulphurets-Mitchell) Prefeasibility Study
Ghaffari, H. (2016-10-06): 2016 KSM (Kerr-Sulphurets-Mitchell) Prefeasibility Study Update and Preliminary Economic Assessment

COPYRIGHT | DISCLAIMER | PRIVACY | ACCESSIBILITY