British Columbia Ministry of Energy, Mines and Natural Gas and Responsible for Housing
News | The Premier Online | Ministries & Organizations | Job Opportunities | Main Index

MINFILE Home page  ARIS Home page  MINFILE Search page  Property File Search
Help Help
File Created: 30-May-1988 by Dani J. Alldrick (DJA)
Last Edit:  11-Aug-2020 by Karl A. Flower (KAF)

Summary Help Help

NMI 104B1 Ag10
Name DAISY, HI HO SILVER Mining Division Skeena
BCGS Map 104B020
Status Showing NTS Map 104B01E
Latitude 056º 11' 35'' UTM 09 (NAD 83)
Longitude 130º 03' 27'' Northing 6228070
Easting 434377
Commodities Silver, Lead, Gold, Copper Deposit Types I05 : Polymetallic veins Ag-Pb-Zn+/-Au
Tectonic Belt Intermontane Terrane Stikine
Capsule Geology

A diabase dike cuts argillite/siltstones of the Lower Jurassic Salmon River Formation (Hazelton Group). Quartz veins carrying minor disseminated galena and tetrahedrite have precipitated out in the folded and fractured argillites adjacent to the dike. There are at least three small quartz veins. All show limited strike length, limited tonnage potential, and trace to minor disseminated galena.

One sample only showed any good values, a grab sample of undetermined size assayed 848.0 grams per tonne silver and 0.2 gram per tonne gold (Assessment Report 12808).

Bibliography
EMPR AR 1925-A106
EMPR ASS RPT *12808
EMPR BULL 58; 63
EMPR OF 1987-22
EMPR PFD 19349
GSC MAP 9-1957; 1418A
GSC P 89-1E, pp. 145-154
Equity Preservation Corp. Compilation: Stewart-Sulphurets-Iskut, Dec. 1988, (Showing No. B88)
Christopher, P.A. (2009-08-03): Technical Report on the Premier Gold Project
Kirkham, G. (2012-06-18): Technical Report on the Resource Estimate for the Premier Gold Property
Kirkham, G. (2012-08-20): Revised Technical Report on the Resource Estimate for the Premier Gold Property
Puritch, E. (2013-03-27): Technical Report and Resource Estimate for the Big Missouri and Martha Ellen Deposits, Premier Gold Property
Rennie, D.W. (2018-06-22): Technical Report on the Premier-Dilworth Project
Rennie, D.W. (2019-01-17): Technical Report on the Premier Project

COPYRIGHT | DISCLAIMER | PRIVACY | ACCESSIBILITY