British Columbia Ministry of Energy, Mines and Natural Gas and Responsible for Housing
News | The Premier Online | Ministries & Organizations | Job Opportunities | Main Index

MINFILE Home page  ARIS Home page  MINFILE Search page  Property File Search
Help Help
File Created: 24-Jul-1985 by BC Geological Survey (BCGS)
Last Edit:  27-Mar-2022 by Nicole Barlow (NB)

Summary Help Help

NMI 092J10 W1
Name CHALCO 12 (L.7702) Mining Division Lillooet
BCGS Map 092J077
Status Showing NTS Map 092J10E
Latitude 050º 43' 28'' UTM 10 (NAD 83)
Longitude 122º 38' 22'' Northing 5619245
Easting 525450
Commodities Tungsten, Copper Deposit Types K01 : Cu skarn
Tectonic Belt Coast Crystalline Terrane Cadwallader, Bridge River
Capsule Geology

Near the western edge of the Cretaceous to Tertiary Bendor pluton, metasediments of the Mississippian to Jurassic Bridge River Complex (Group), including limestone, chert and argillite, are altered to quartz-hornblende schist. Two granodiorite tongues extend west into the northwest striking, steeply dipping sediments. Limestone lenses in the schist are altered to skarn; they contain massive chalcopyrite and smaller masses of pyrite and pyrrhotite with associated blebs of quartz and green diopside. Well crystallized garnet and epidote occur with scattered grains of scheelite throughout the veins.

Work History

The occurrence was first reported in the 1948 B.C. Minister of Mines Report.

In 1979, Hat Creek Energy Corp. examined the area. In 1987, Trans Atlantic Resources Inc. and Armeno Resources Inc. completed a program of geochemical sampling and ground electromagnetic and magnetic surveys of the skarn zones.

In 2006, Covenant Resources Ltd. examined the area as the Piebiter property. In 2007 and 2008, airborne ZTEM surveys were completed on the area. In 2009, a MMI soil sampling program was completed. In 2011, Worthington Resources Ltd. completed a 408.5 line-kilometre airborne ZTEM survey on the area as the Royalle property.

Bibliography
EMPR AR 1948-99; 1952-114; 1954-103; 1955-33; 1958-71
EMPR ASS RPT 105, *15871, 16725, 19828, 29854, 30817, 31523
EMPR FIELDWORK 1974, p. 35; 1985, pp. 303-310; 1986, pp. 23-29; 1987, pp. 93-130; 1988, pp. 105-152; 1989, pp. 45-72; 1990, pp. 75-83
EMPR GEM 1969-187
EMPR OF 1987-11; 1988-3; 1989-4; 1990-10
EMPR PF (Claim map by Hat Creek Energy Corp.; Statement of Material Facts, Armeno Resources Inc., 1987; Sheppard, E.P. (1979): Summary Report on the Lime Creek Tungsten Showing, Hat Creek Energy Corp.; Claim map, 1979)
GSC MAP 431A
GSC MEM 213, p. 88
GSC OF 482
GSC P 77-2 (Sample GSC 76-50)
GSC SUM RPT 1932, Part A, pp. 57-71
Makepeace, D.K. (2007-03-30): Technical Report - Piebiter Property
Carpenter, T.H. (2011-07-29): Technical Report on the Royalle Property with Recommendations for Further Exploration
Carpenter, T.H. (2012-02-21): Technical Report on the Royalle Property with Recommendations for Further Exploration
Talisker Resources Ltd. (2020-09-02): NI 43-101 Technical Report, Bralorne Gold Project, Bralorne, British Columbia, Canada

COPYRIGHT | DISCLAIMER | PRIVACY | ACCESSIBILITY