EMPR AR 1923-213; 1926-268; 1950-133,151; 1951-180; 1952-192;
1953-146;1956-106; 1957-60; 1958-50; 1959-71
EMPR BULL 49, p. 71
EMPR FIELDWORK 1992, pp. 9-16
EMPR GEOS MAP 1995-1
EMPR OF 2000-22
EMPR PF (82KSE General File - Geology map by P. Billingsley, 1958; National Mineral Inventory Card, "Duncan Nos. 4-8 Zones (J.G.) (Lakeside, Grizzly)"0)
GSC MAP 1326A
GSC MEM 161, p. 95; 369
Pope, A.J. (1989): The Tectonics and Mineralization of the Toby-
Horsethief Creek Area, Purcell Mountains, Southeast British
Columbia, Canada, unpublished Ph.D. Thesis, University of London,
England
Lane, R.A. (2018-07-20): Technical Report on the Duncan Lake Zinc-Lead Project
|