British Columbia Ministry of Energy, Mines and Natural Gas and Responsible for Housing
News | The Premier Online | Ministries & Organizations | Job Opportunities | Main Index

MINFILE Home page  ARIS Home page  MINFILE Search page  Property File Search
Help Help
File Created: 01-Mar-1986 by Eileen Van der Flier Keller (EVFK)
Last Edit:  09-Feb-2016 by Jessica Norris (JRN)

Summary Help Help

NMI
Name MCGILLIVRAY, MCGILLIVRAY (LOOP), FORDING COAL, LOOP RIDGE Mining Division Fort Steele
BCGS Map 082G067
Status Past Producer NTS Map 082G10W
Latitude 049º 38' 40'' UTM 11 (NAD 83)
Longitude 114º 47' 09'' Northing 5501454
Easting 659844
Commodities Coal Deposit Types A04 : Bituminous coal
Tectonic Belt Foreland Terrane Ancestral North America
Capsule Geology

The McGillivray occurrence is located approximately 15 kilometres southeast of Sparwood, British Columbia, in the Michel Creek area.

Up to twelve coal seams ranging in thickness from 4.0 to 0.2 metres were encountered in drill holes along the pipeline right of way northeast and south of the McGillivray Station. The seams are interbedded with shale, siltstone and sandstone of the Jurassic- Cretaceous Mist Mountain Formation (Kootenay Group). Beds dip west between 8 and 60 degrees (generally approximately 30 degrees). The area is bounded to the east by the Erickson normal fault, which trends approximately north to north-northwest.

The seams in the area from oldest to youngest are L10 (3.4 metres), 10 (4.9 metres), 9 (2.7 metres), 8 (7.6 metres), 7 (4.9 metres), 6 (2.1 metres), 5 (3.5 metres), U5 (2.1 metres), 4 (2.6 metres), U4 (5.8 metres), 3 (5.3 metres) and U3 (7.0 metres). The values in brackets are average thicknesses. The coal is very high in ash content.

Exploration in the area dates back to the late nineteenth century. Crow’s Nest Pass Coal Company mapped the property in 1964, and also excavated 7 trenches, 2 adits, and drilled at least 12 exploratory drilling holes. In-place, partially explored reserves reported in 1964 were 153,470,000 tonnes at a pitch of 30 to 90 degrees and with 0 to 457 metres of cover; and 13,324,000 tonnes with 457 to 762 metres of cover (Coal Assessment Report 430). In 1969, Crow’s Nest Pass Coal Company mined the McGillivray Pit at the north end of the property, and it is estimated that 60,000 to 100,000 tonnes of coal was produced (Coal Assessment Report 983).

Following environmental studies and a bulk sample permit, McGillivray Mining Ltd mined approximately 20,000 tonnes of coal at the McGillivray site in 1995. In 1996, Fording Coal purchased McGillivray’s property rights and mined another 30,000 tonnes of coal. Fording completed two drill programs on the property, completing 18 holes in 1998, and 18 holes in 1999 (Coal Assessment Report 983).

CoalMont Pty Ltd of Australia is advancing the Michel Creek Coking Coal Project through its Canadian subsidiary CanAus Coal Ltd, which includes exploring and developing the Loop Ridge Mine (McGillivray). At Loop Ridge in 2013, exploration consisted of drilling 37 reverse circulation holes, 4 pilot holes, and 8 large diameter holes totalling 9260 metres for coal seam rank variability and coal quality characteristics (Coal Assessment Report 923). In 2014, exploration consisted of drilling 66 reverse circulation holes, 19 pilot holes, 13 large diameter holes, 8 HQ3 core holes, and 2 large diameter reverse flood holes, totalling 19,809 metres. The objective of the drilling was for coal seam rank variability characterization and coal quality analysis (Coal Assessment Report 983). Drilling has identified 20 coal seams with cumulative thickness of 70 metres within a 504 metre stratigraphic section of the Mist Mountain Formation. Drilling continued in 2015, along with resource modelling and environmental studies. CanAus Coal Ltd entered into the Environmental Assessment process for the Loop Ridge Mine in October 2015.

As of 2015, the focus of the Michel Creek Coking Coal Project is the proposed Loop Ridge Mine, which has a potential for an approximately 10 year mine life, with opportunities for expansion in other areas. The proposed open-cut project is estimated to have an annual production of 3.3 million tonnes of raw coal (2 million tonnes clean coal), with an average production rate of 5500 tonnes of clean coal per day, based on a 365 day operating period. Initial raw tonnage estimates indicate potential resources between 120-140 million tonnes of coking coal (not National Instrument 43-101 compliant). Geological modelling and drill hole and coal quality data correlation is underway in order to define a National Instrument 43-101 compliant resource.

Bibliography
EMPR COAL ASS RPT *430, 923, *983
EMPR EXPL 1998-13, 73; 2013, 134; 2014, 42-43
EMPR INF CIRC 2015-1, 13; 2015-3, 7, 9; 2016-2, 6, 7
GSC P 89-4
Pearson, D.E. and Grieve, D.A.(1985): *CIM 1985, Vol.78, No. 881 pp. 39-46

COPYRIGHT | DISCLAIMER | PRIVACY | ACCESSIBILITY