Bibliography |
EMPR AR 1894-map after 758; 1896-577,581; 1897-582,*585-586;
*1898-1121-1122; 1899-604,752,765-766; 1900-721,866,875,880;
1901-1051,1054-1055,1058; 1902-24,176,178; 1903-165,170; 1904-209,
214-216; 1905-175,177,178,182; 1906-156,250; 1907-109,111,
113; 1908-112; 1909-130,273; 1910-244; 1911-174,176,285;
1912-163,164,167,236; 1913-141-146,161,320,421; 1914-333,511;
1915-198,199,203,446; 1916-254,518; 1917-22,203,211,374; 1918-209;
1956-75; 1959-A46,58; *1960-A53,64,65; 1961-A47,64,65; 1962-A48,68;
*1968-228-230
EMPR BC METAL MM00900
EMPR BULL 101, pp. 57, 237, Appendix 4B, 6
EMPR FIELDWORK 1984, pp. 17-21; 1987, pp. 273-275
EMPR GEM 1969-307; 1970-429-430; 1971-380-381; 1973-38-39;
1974-36-37
EMPR INDEX 3-206
EMPR MAP 59; 65
EMPR OF *1990-25; 1992-1; 1998-10
EMPR P 1986-2; *1989-3, pp. 41-43, 99, Appendix 7
EMPR PF (*Senecal, C.O. (1911): Map 29A - Mother Lode and Sunset; Senecal, C.O. (1911): Map 30A - Mother Lode and Sunset Mines; LeRoy, O.E. (1912): The Geology and Ore Deposits of Phoenix; Frederick, F.H. (1951-08-30): Report on Motherlode Sunset Mine; Consolidated Woodgreen Mines Ltd. (1959): Photo of Motherlode Pit with ore bins and conveyors partly visible; Consolidated Woodgreen Mines Ltd. (1959): Photo of operating a jackleg drill breaking large rocks - Motherlode Open Pit; *Aabro Mining and Oils Ltd. (1967-09-26): The Motherlode and Greyhound Properties; Aabro Mining and Oils Ltd. (1968): Geological Sketch Map of the Motherlode and Sunset; Sulamet Mines Ltd. (circa 1956): Diamond Drillhole Plan, in 082ESE050)
EMR MIN BULL MR 223 (1989) B.C. 7
EMR MP CORPFILE (Cadillac Explorations Limited; Greyhound Mines Ltd.;
Aabro Mining & Oils Ltd.; Cumberland Mining Company Limited; The
British Columbia Copper Company, Limited; GM Resources Limited;
Mascot Mines & Petroleums Limited)
GSC MAP 29A,*30A; 6-1957
GSC MEM *19; 21; 38
GSC OF 481; 637; 1969
GSC P 45-20; 67-42; 79-29
CANMET IR 600; 748
CIM Transactions Vol. 5 (1902) pp. 365-378; Vol. 49 (1956)
CMJ July 1, 1907 pp. 228-233
EMJ Vol. 95, No. 12 (1913), pp. 559-601
N MINER Apr.12, 1984
Dufresne, M. (2013-11-10): Technical Report for the Greenwood Gold Project
*Dufresne, M. (2013-11-25): Technical Report for the Greenwood Gold Project
EMPR PFD 320, 665, 666, 1080, 1097, 1098, 1099, 1100, 1101, 1102, 1103, 1104, 1105, 1106, 1107, 1151, 1167, 750263, 750264, 750265, 750266, 750267, 907238, 907378, 812128, 812129, 812130, 812131, 812135, 812136, 812140, 812141, 812211, 812212, 812213, 812214, 812215, 812218, 812219, 812220, 812221, 812222, 812225, 812226, 812227, 812231, 812234, 812246, 812251, 812223, 800052, 823295, 824735, 824740, 824758, 824768, 824769, 824781, 824802, 823453, 823631, 600099, 801927, 801951, 801966, 801968, 802008, 862660, 507386, 507387, 896744
|