British Columbia Ministry of Energy, Mines and Natural Gas and Responsible for Housing
News | The Premier Online | Ministries & Organizations | Job Opportunities | Main Index

MINFILE Home page  ARIS Home page  MINFILE Search page  Property File Search
Help Help
File Created: 24-Jul-1985 by BC Geological Survey (BCGS)
Last Edit:  15-Sep-1995 by Gilles J. Arseneau (GJA)

Summary Help Help

NMI
Name RELIEF Mining Division Golden
BCGS Map 082K049
Status Showing NTS Map 082K08W
Latitude 050º 29' 57'' UTM 11 (NAD 83)
Longitude 116º 20' 25'' Northing 5594341
Easting 546789
Commodities Silver, Lead, Antimony Deposit Types I05 : Polymetallic veins Ag-Pb-Zn+/-Au
Tectonic Belt Omineca Terrane Ancestral North America
Capsule Geology

The Relief occurrence is situated on Bruce Creek at 2745 metres elevation above sea level in the Golden Mining Division.

Regionally, the area is underlain by Proterozoic clastic sedimentary rocks of the Purcell and Windermere supergroups and by lower Paleozoic strata of the Beaverfoot and Mount Forster formations (Geoscience Map 1995-1).

The Purcell Supergroup strata include the Aldridge, Creston, Kitchener, Dutch Creek and Mount Nelson formations. The Windermere Supergroup unconformably overlies the Purcell Supergroup rocks and includes the Toby Formation and Horsethief Creek Group (Paper 1990-1).

In the vicinity of the occurrence, rocks of the Kitchener and Dutch Creek formations have been further subdivided and assigned to the Van Creek and Gateway formations. The Van Creek Formation correlates with the Lower Kitchener Formation while the Gateway Formation is equivalent to the lower portion of the Dutch Creek Formation. The Mount Nelson Formation has been subdivided into seven discrete members, a lower quartzite, a lower dolomite, a middle dolomite, a purple dolomite, an upper middle dolomite, an upper quartzite, and an upper dolomite (Open File 1990-26).

Rocks of the Horsethief Creek Group, Beaverfoot and Mount Forster formations are folded and overthrusted by rocks of the upper portion of the Dutch Creek Formation and the lower members of the Mount Nelson Formation. The sedimentary rocks have undergone regional metamorphism to at least greenschist facies.

The showing consists of galena and stibnite occurring in narrow quartz veins cutting Mount Nelson dolomite. An 18-tonne sample was mined from the occurrence in 1918 but recoveries proved to be uneconomical (Minister of Mines Annual Report 1919).

Bibliography
EMPR AR *1917-146-178; 1918-185; 1919-113; 1922-185; 1925-222; 1927-265
EMPR ASS RPT 16811
EMPR FIELDWORK 1989, pp. 29-37
EMPR GEOS MAP 1995-1
EMPR OF 1990-26
EMPR PF (82KSE General File - Geology map by P. Billingsley, 1958)
GSC MAP 1326A
GSC MEM 369
Pope, A.J. (1989): The Tectonics and Mineralization of the Toby- Horsethief Creek Area, Purcell Mountains, Southeast British Columbia, Canada, unpublished Ph.D. Thesis, University of London, England

COPYRIGHT | DISCLAIMER | PRIVACY | ACCESSIBILITY